Dustless sanding and prep

Dustless sanding in Barnsley, before a drop of paint.

Mirka sanders on extraction, floors under Rynix RollGuard, cracks filled and stains sealed. The part of decorating you never see is the part you live with.

A Mirka sander on extraction working along the edge of a door frame

Same sander pad. Two very different houses.

Sanding is what makes filler disappear and new paint grip. Done the old way it fills the house with fine dust. On extraction, Gary's Mirka kit pulls about 95% of it straight off the pad.

Sanding by hand or on a bare sander

  • Dust settles on every surface in the house
  • Days of wiping skirting and hoovering after
  • Dust in the air ends up in the wet paint

Mirka on extraction

95%
  • The dust goes up the hose into the extractor
  • Far less cleaning, the house stays breathable
  • A cleaner surface means a smoother finish

“The walls and ceilings were sanded with Mirka tools and the finish is just on another level.”

David Wetherill, Google review

A Mirka sander held flat to a white wall, its extraction hose running away down the arm, a green light on the body

95%

of the dust caught at the sander by Gary's Mirka extraction. His figure, and he is honest that nothing is 100%.

The dust goes up the hose, not over your sofa.

Six things happen in every room before a colour goes on. They are the reason one customer said the finish is “just on another level”, and the reason nobody is hoovering for a week afterwards.

The prep sheet

Every room

  1. A long hallway with the carpet covered by Rynix RollGuard taped down at both edges, a dust extractor at the far endFloors under RynixCarpets and floors covered with Rynix RollGuard, taped at the edges, before a tin is opened.
  2. A window reveal and sill painted bright white, tape still holding the dust sheet belowEdges tapedSills, skirting and glass masked off, so the line is crisp when the tape comes up.
  3. A kitchen wall patched with filler and old plaster before painting, a tall fridge freezer and a dust extractor on the floorCracks filledHoles, cracks and blown patches filled and left to go off properly.
  4. A Mirka sander on extraction working along the edge of a door frameSanded on extractionMirka sanders plugged into an extractor, flattening the filler and keying the old paint.
  5. A bathroom ceiling with brown water stains spreading from the light fitting, taped off ready for stain blockStains blockedWater marks and nicotine sealed with Zinsser B-I-N, so they never bleed back through.
  6. A radiator halfway through: the left half still yellowed cream, the right half fresh white, a brush on the dust sheet belowUndercoatedWoodwork and radiators keyed and undercoated before the satinwood goes on.
A long hallway with the carpet covered by Rynix RollGuard taped down at both edges, a dust extractor at the far end
The same narrow hall finished, white doors and frames, the floor still under its taped protection film

Floors first

Your carpet goes under Rynix RollGuard before a tin is opened.

Gary lays Rynix RollGuard down the whole working area on every job and tapes it at both edges, so it cannot creep or lift. He calls it the best carpet protection on the market, and it is why a hallway can be painted top to bottom with the carpet left in.

Repairs, water stains and insurance work.

Cracks, blown plaster and old water marks get sorted before paint, or they come straight back through it. Stains are sealed with Zinsser B-I-N so they never bleed through the new coat.

Repairs and prepFilling, sanding and stain blocking£40 to £120
Insurance quotesA detailed assessment of the damage and the repair, then the work itselfWritten for your claim
Ask about an insurance quote
A bathroom ceiling with brown water stains spreading from the light fitting, taped off ready for stain block
Water stains, taped off for blocking
Trade tins on a work platform: Zinsser B-I-N primer, Crown Trade acrylic eggshell, Dulux Trade Diamond Satinwood and Anti-Reflex White 2
B-I-N primer in the kit

Prep questions.

Mostly his own answers, from 21 years of being asked them in people's front rooms.

Quicker to ask Gary07908 836945

Is dustless sanding really dust-free?

No process is 100% dust-free, but Gary's Mirka extraction removes about 95% of the dust at source. That means far less cleaning up and your home protected while he works.

Will my floors and furniture be protected?

Yes. Floors go under Rynix RollGuard taped at the edges, furniture is moved and covered, and edges are masked before any paint is opened.

Do you do insurance work?

Yes. Gary writes detailed assessments for insurance claims and repairs, such as water-damaged ceilings, and then does the work.

How long does a typical room take?

A standard sized room usually takes 2 to 3 days for a full redecoration, including prep and painting of walls, ceilings and woodwork.

Free quotes, Barnsley and surrounding areas

Get your room in the 2027 diary.

Four taps for a free quote, or send Gary a few photos of the room on WhatsApp. He prices it properly, then you pick your dates.

Diary

2027

Now taking bookings.

Dates go in the order people book.

Get a free quote Call